menu
close
Artis hotel meteor 00
Meteor
2025
Heart of the Marais, Paris 3rd
280m²
6 months
2025

Meteor.

Hospitality.
Heart of the Marais, Paris 3rd
General Contractor
280m²
6 months

Deep renovation of a building housing 9 apartment-hotel units in the heart of the Marais.

Each room was stripped back to bare walls to start fresh with compliant technical networks and materials tailored to the architectural project. Result: apartments all different, where technical and architectural solutions were shaped to offer the most spacious and ergonomic volumes possible while ensuring optimal functionality. The stripping was an opportunity to work with engineering firms to study the building's structural integrity and allowed for framework repairs to provide a resistant and durable skeleton for the project. The concept highlighted the uniqueness of each apartment by bringing in artists who created a unique decor in each room.

Projet HOTEL METEOR - Photo 1 | Artis@vincentmuracciole

One hotel, but 9 technical challenges for 9 different rooms

Projet HOTEL METEOR - Photo 2 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 3 | Artis@vincentmuracciole
ARTIS HOTEL METEOR@photo4 vincentmuracciole
Projet HOTEL METEOR - Photo 5 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 6 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 7 | Artis@vincentmuracciole

A deep renovation, including structural work up to the framework of this building in the heart of the Marais

Projet HOTEL METEOR - Photo 8 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 9 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 10 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 11 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 12 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 13 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 14 | Artis@vincentmuracciole
Projet HOTEL METEOR - Photo 15 | Artis@yohannfontaine
Projet HOTEL METEOR - Photo 16 | Artis@yohannfontaine